Over two days, we carried out the full removal and replacement of a Terry Lifts Melody platform lift at Fir Croft in Surbiton.
On day one, our engineers safely removed the existing lift and made the area secure for residents and staff. Installation of the new Terry Lifts Melody then began straight away.
All works were completed in line with safety requirements and the site's own procedures, so the building could keep running normally while we worked.